3D Sleigh
Assembly Instructions
Components are
2 x side of sleigh
2 x sleigh runners
2 x decoration for top of sleigh sides
1 x main section of the sleigh
I would recommend using very tacky double sided tape for sticking the sides to the main section, it can get a bit messy with glue.
So stick one of the sides to the main section starting from the back of the sleigh, taking care to keep the curves neat. Then attach the other side
Now glue on the decoration on the top edge of the sleigh
For the runners I actually cut 4 and glued 2 together for strength
Attach the runners along the bottom lining them up with the bottom of the sleigh
Make sure you keep the runners level otherwise you'll have a rocking sleigh lol
No comments:
Post a Comment