Friday, 10 November 2017

Schwibbogen Decoration
assembly instructions below

Please scroll down for different design assembly 

Starry Night 
Tealight style Schwibbogen
The Tree design and lantern design also goes the same way
 



Layer the arches in this order so that the vellum is sandwiched by the 2 front arch sections. Do the same for the back arch 





Your finishes arch section will look like this









Glue the spacer where you see the green highlight on the image to the right

There are dash location marks on the arches for you to line the spacers up with the glue tabs fold upwards




Now fold the other end of the spacer upwards and apply glue 




Line up the second arch with the glue tabs making sure you keep it in line with the other arch as you see in the lower image on the left




Now slot the bottom of the arches into the base open out the glue tabs and glue in place thi will make the arch stand upright.

The spacers are also tea light shelves they just sit on the shelf


 Woodland walk
String light style Schwibbogen








 There are 3 arches to the design

Step 1
Cut 2 of each arch and glue together for strength
Step 2
add the spacers to the back arch using the dash line location marks, glue tabs fold upwards
step 3
fold the other side of the glue tabs upwards and  apply glue and put the middle arch over the top and position so that the glue tabs fall in the same place as on the the one you already did. 
step 4 
do the same again for the front arch
Then open the arch out so that it's now a 3D object like in the image above bottom right

step 5
slot the bottom tabs of the 3 arches in to the 3 slots on the base section
Open out the glue tabs and glue in place, then stand the arches upright and let dry.
steps 5 6 and 7
Slot in the layers of the scene into the slots in the base
step 8 glue in the 2 front tree layers in front of the arch
Step 9
glue to the main base to hide all the glue tabs and make stable

Sunday, 5 November 2017

Santa's workshop template
Assembly instructions


Video tutorial assembly instructions
Copy and paste the links

Part 1
https://m.youtube.com/watch?v=89WDkFNhB_g

Part 2
https://m.youtube.com/watch?v=mo6uhcJr9Ao

Hanging Christmas Tree box card 
Assembly instructions 
Visit the shop My SVG HUT 
For hundreds of great designs 





Assembly intructions 


  Step 1 - 6
You have cut all your pieces

Glue the background to what will be the inside of the card like shown in number
 3.
Turn the card over and glue the frames and snowflakes in place


 Steps 7 - 12

Fold the card as shown in number 7 and 8.
From the left it goes as follows
Valley,   mountain, mountain, mountain, valley mountain, mountain, mountain
Now add glue to the glue tab, and attach to the opposite side of the card as shown in number 10.
Now push the 2 valley folds inwards like number 11 and 12




Steps 13 - 18
Take the 2 tree sections slot together and fold the glue tabs as shown in number 15.
Slot the tree into the base of the card and attach the glue tabs just under the window opening as shown in number 17 and 18





Steps 19 - 24
Add the ribbon decoration as shown in number 20
Make the envelope
You have now completed your card and envelope